GREENFIELD HILL CONGREGATIONAL CHURCH
Church House Construction Progress Index
   
The way it looked
Moving out
 
The Ground Breaking
Inside Demolition
Bldg Demolition
The Foundation
 
The Framing
Second Floor & Roof
More Bee Hive
 
The Rooms
More Rooms
Finishing Touches
       
Second Floor and Roof
 
September 12 -2nd floor walls take shape
 
Inside view of 2nd floor walls
 
New wing joins original Church House
 
Sept 18 - Removing siding from the Church House
 
New siding to be installed on South wall
 
Tyvek is installed first
 
Then North wall old siding is removed
 
Rafters installed for the roof
 
The rafter crew
 
A look at a second floor large room
 
Well deserved coffee (and popcorn) break
 
Sept 28 - A roof main beam goes in
 
Roof rafters and roofing plywood installed
 
Looking down the elevator shaft
 
A window opening gets installed
 
Part of the new attic
 
And, the old attic will be new again!
 
Roof plywood and fake chimney installed
 
The project manager (L) and carpenter (R).
  Oct 4 - Two new boilers arrive in the basement
 
Asbestos shingles stripped off Memorial Room
 
New shingles will be applied
 
Oct 12 - New roof shingles being installed
 
Original Church House gets new shingles also
 
Detail of new building outside moulding
 
Oct 23 - Installing insulation in walls
 
Installing insulation in crevices
 
All ceilings being insulated
 
Drywall ready for installation
 
HVAC ducting is delivered
 
HVAC ducts shaped and being installed
 
Supplies waiting for the plumbers
 
Hot water tank delivered
 
Outside, a trench dug for new electrical conduit
 
Bricks for the outside of the basement walls
 
Oct 26 - The Memorial Room has new shingles
 
The new windows arrive
 
The new doors arrive
 
Drywall installation has started
 
A hallway gets a ceiling
 
Building the entrance stairway
 
Cutting the Pennsylvania Blue Stone steps
 
Celebrating the first step into the new building!
 
Oct 31 - Here's the finished steps
 
The windows are installed
 
The plumbing is going in
 
The air ducts are being installed and insulated
 
Kitchen & Memorial Room window is enlarged
 
All Church House chimneys get new tops
 
The outside doors get installed
   
Old and new Church House get a fresh coat of paint
   
 