GREENFIELD HILL CONGREGATIONAL CHURCH | |||
|---|---|---|---|---|
Second Floor and Roof |
||||
![]() |
![]() |
|||
September 12 -2nd floor walls take shape |
Inside view of 2nd floor walls |
|||
![]() |
![]() |
|||
New wing joins original Church House |
Sept 18 - Removing siding from the Church House |
|||
![]() |
![]() |
|||
New siding to be installed on South wall |
Tyvek is installed first |
|||
![]() |
![]() |
|||
Then North wall old siding is removed |
Rafters installed for the roof |
|||
![]() |
![]() |
|||
The rafter crew |
A look at a second floor large room |
|||
![]() |
![]() |
|||
Well deserved coffee (and popcorn) break |
Sept 28 - A roof main beam goes in |
|||
![]() |
![]() |
|||
Roof rafters and roofing plywood installed |
Looking down the elevator shaft |
|||
![]() |
![]() |
|||
A window opening gets installed |
Part of the new attic |
|||
![]() |
![]() |
|||
And, the old attic will be new again! |
Roof plywood and fake chimney installed |
|||
![]() |
![]() |
|||
The project manager (L) and carpenter (R). |
Oct 4 - Two new boilers arrive in the basement | |||
![]() |
![]() |
|||
Asbestos shingles stripped off Memorial Room |
New shingles will be applied |
|||
![]() |
![]() |
|||
Oct 12 - New roof shingles being installed |
Original Church House gets new shingles also |
|||
![]() |
![]() |
|||
Detail of new building outside moulding |
Oct 23 - Installing insulation in walls |
|||
![]() |
![]() |
|||
Installing insulation in crevices |
All ceilings being insulated |
|||
![]() |
![]() |
|||
Drywall ready for installation |
HVAC ducting is delivered |
|||
![]() |
![]() |
|||
HVAC ducts shaped and being installed |
Supplies waiting for the plumbers |
|||
![]() |
![]() |
|||
Hot water tank delivered |
Outside, a trench dug for new electrical conduit |
|||
![]() |
![]() |
|||
Bricks for the outside of the basement walls |
Oct 26 - The Memorial Room has new shingles |
|||
![]() |
![]() |
|||
The new windows arrive |
The new doors arrive |
|||
![]() |
![]() |
|||
Drywall installation has started |
A hallway gets a ceiling |
|||
![]() |
![]() |
|||
Building the entrance stairway |
Cutting the Pennsylvania Blue Stone steps |
|||
![]() |
![]() |
|||
Celebrating the first step into the new building! |
Oct 31 - Here's the finished steps |
|||
![]() |
![]() |
|||
The windows are installed |
The plumbing is going in |
|||
![]() |
![]() |
|||
The air ducts are being installed and insulated |
Kitchen & Memorial Room window is enlarged |
|||
![]() |
![]() |
|||
All Church House chimneys get new tops |
The outside doors get installed |
|||
![]() |
||||
Old and new Church House get a fresh coat of paint |
||||
| TOP | ||||