The way it looked
Moving out
 
The Ground Breaking
Inside Demolition
Bldg Demolition
The Foundation
 
The Framing
Second Floor & Roof
 
The Rooms
More Rooms
       
A Bee Hive of Activity
 
A roof over the porch
 
Bricks laid on basement outside walls
 
Plumbing - Blue: cold, Red: hot, White: waste  
Electricians hard at work
 
Heating/Cooling Unit in attic
 
Main heating/cooling duct installed
 

Ducts stacked for installation

 
Flexible ducts feed into the rooms
 
Hot Water boilers ready for hook up
 
Brick work almost done
 
The Mystery brick. Why is it darker in color than the others? Where did it come from? Why is it there? See answer at bottom right panel.  

November 28

Trench for footing for retaining (stone) wall

 
Fire sprinkler pipes (black) installed
 
Boiler distribution pipes being set up
 
Pipe fitter making boiler connections
 
TV coax, Ethernet and telephone cables all combined in one blue cable
 
Blue cables distributed to all the rooms
 
Heating & A/C ducting hooked up
 
Dec 4 - Building the retaining wall
 
Trench for new water line from road
 
Boiler distribution pipes hooked up
 
Memorial Room becomes cabinet factory
 
Cabinet materials arriving
 
Each floor has heating & A/C blower closets
 
Dec 10 - The first room cabinet of many
 
A/C compressors will be behind the building
 
Electrician installing room outlets
 
All electrical & communication cables lead to future basement electrical control room
 
Boiler room becomes a maze of pipes
 
Dec 18 - Ready for insulation and wallboard
 
Boilers finished
 
Electricians finishing up!
 
The "Mystery Brick" is a brick from the old torn down building. It is a reminder of how things used to be.
Cabinets being made for all rooms
   
     