Church House Construction Progress Index
The way it looked
Moving out
The Ground Breaking
Inside Demolition
Bldg Demolition
The Foundation
The Framing
Second Floor & Roof
The Rooms
More Rooms
Finishing Touches
     
A Bee Hive of Activity Continues
Jan 4 - A heated tent is put up outside
Working in the tent on stone retaining wall
Memorial Room ramp to be replaced
Ramp will be all new wood
Old rooms under Memorial Room get new electrical, lights, smoke detectors and sprinklers
Entrance to attic above Memorial Room cut through cinder block wall for entry
Looking into attic crawl space where smoke detectors and sprinklers will be installed over Memorial Room
A look at a fire sprinkler head
A look at a smoke detector receptacle. Black pipe is for fire sprinklers
Jan 14 - The insulation starts arriving
The insulation is installed
All walls get insulation before being sheetrocked
Hallway ceilings get frames for acoustical panels
Back exit stairway landing constructed
Stairs (pre built) are delivered
Back exit stairs installed
Meanwhile, the cabinet makers keep busy
All cabinets & desks are made on site
Concrete poured for walkway (on wet day)
Stone retaining wall by walkway
Installing master electrical inlet panel
And, electrical distribution panels installed
Jan 21 - Stone wall walkway is completed
The view down the steps
Wallboard ready for installation
Fitting on the ceiling a two man operation
Wallboard is screwed on to ceiling and walls
A partially finished room
The elevator parts arrive
Elevator being installed in the shaft
Looking down the shaft at elevator floor
Jan 25 - Another look at the elevator
The cabinet shop gets wood delivered
A look at the 2nd floor hallway
A look at a large room on 2nd floor
A look at a small room on 2nd floor
And still another different room
Jan 30 - Doing the wallboard taping
Elevator doors finished
Kitchen exhaust fan ready for the roof
Kitchen exhaust hood ready for installation
Electrical panels installed
Building water intake installed
Air exchanger installed in basement
Working on entrance ramp
New entrance ramp beams installed