Jan 4 - A heated tent is put up outside |
Working in the tent on stone retaining wall |
||
![]() |
![]() |
||
Memorial Room ramp to be replaced |
Ramp will be all new wood |
||
![]() |
![]() |
||
Old rooms under Memorial Room get new electrical, lights, smoke detectors and sprinklers |
Entrance to attic above Memorial Room cut through cinder block wall for entry |
||
![]() |
![]() |
||
Looking into attic crawl space where smoke detectors and sprinklers will be installed over Memorial Room |
A look at a fire sprinkler head |
||
![]() |
![]() |
||
A look at a smoke detector receptacle. Black pipe is for fire sprinklers |
Jan 14 - The insulation starts arriving |
||
![]() |
![]() |
||
The insulation is installed |
All walls get insulation before being sheetrocked |
||
![]() |
![]() |
||
Hallway ceilings get frames for acoustical panels |
Back exit stairway landing constructed |
||
![]() |
![]() |
||
Stairs (pre built) are delivered |
Back exit stairs installed |
||
![]() |
![]() |
||
Meanwhile, the cabinet makers keep busy |
All cabinets & desks are made on site |
||
![]() |
![]() |
||
Concrete poured for walkway (on wet day) |
Stone retaining wall by walkway |
||
![]() |
![]() |
||
Installing master electrical inlet panel |
And, electrical distribution panels installed |
||
![]() |
![]() |
||
Jan 21 - Stone wall walkway is completed |
The view down the steps |
||
![]() |
![]() |
||
Wallboard ready for installation |
Fitting on the ceiling a two man operation |
||
![]() |
![]() |
||
Wallboard is screwed on to ceiling and walls |
A partially finished room |
||
![]() |
![]() |
||
The elevator parts arrive
|
Elevator being installed in the shaft |
||
![]() |
![]() |
||
Looking down the shaft at elevator floor |
Jan 25 - Another look at the elevator |
||
![]() |
![]() |
||
The cabinet shop gets wood delivered |
A look at the 2nd floor hallway |
||
![]() |
![]() |
||
A look at a large room on 2nd floor |
A look at a small room on 2nd floor |
||
![]() |
![]() |
||
And still another different room |
Jan 30 - Doing the wallboard taping |
||
![]() |
![]() |
||
Elevator doors finished |
Kitchen exhaust fan ready for the roof |
||
![]() |
![]() |
||
Kitchen exhaust hood ready for installation |
Electrical panels installed |
||
![]() |
![]() |
||
Building water intake installed |
Air exchanger installed in basement |
||
![]() |
![]() |
||
Working on entrance ramp |
New entrance ramp beams installed |
||