![]() |
GREENFIELD HILL CONGREGATIONAL CHURCH | |||
|---|---|---|---|---|
The Building Demolition - July 11, 2007 |
||||
![]() |
![]() |
|||
The equipment arrives |
Saving the rhododendrons |
|||
![]() |
![]() |
|||
Rhododendrons transplanted for a while |
The first CRUNCH !! |
|||
![]() |
![]() |
|||
A few crunches later |
Down comes the roof |
|||
![]() |
![]() |
|||
Then the small wing collapses in dust |
Then on to the bigger section |
|||
![]() |
![]() |
|||
The bigger wing section is opened up |
The inside falls through |
|||
![]() |
![]() |
|||
Finally it is all down (in 2 1/2 hours) |
Some finishing touches the crane can't do |
|||
![]() |
![]() |
|||
Sadly, a pile of rubble |
The dumpsters arrive |
|||
![]() |
![]() |
|||
Loading the dumpsters begins |
Cleanup continues |
|||
![]() |
![]() |
|||
Three dumpsters at once |
Church House 2nd floor exposed |
|||
![]() |
![]() |
|||
Done!! |
Next is the driveway |
|||
![]() |
||||
Driveway is gone |
||||
| TOP | ||||